Sunday
some of the concrete forms
are up.
It was a
beautiful
sunny day.
Monday
President's day
the concrete forms are almost all in place.
Later
in the afternoon
the rebar is still being tied into place.
Kathleen
inspects
the work.
Big
trenches
will hold the 4 inch water pipe for the hydrant,
power, and communications lines.
Kathleen
takes a walk
up to inspect the water tank.
Monday was beautiful on the mountain, but a little
hazy
back down in the valley.