By Saturday, Simon had the cables and
the first few planks
started on the bridge between the two tall pines. The tire swing is in
the foreground.
On Sunday
Josh Jeschien
is the second one to try out the bridge. The bridge is 15 feet high
on the near side, and 45 feet high on the far side, because the ground
slopes away.
Simon hands the camera to Josh
and takes a stoll
on the nearly complete bridge. About 20 more planks need to be set,
and then some handrails for the timid.
Kathleen tries the
tire swing
under a still more complete bridge.
A view of the completed bridge, looking from the
West
side.
A view of the completed bridge, looking from the
East
side.
A view of the bridge from the
side
.
A view of the bridge from
below
, showing some construction details.
A view of the bridge and the
swing
.